 The redevelopment was designed by Kliment Halsband Architects. The construction manager is Tishman Construction. 

Please feel free to contact us at projects@friendsseminary.org or call our Information Line at 646-979-5225 for questions or comments.


 

August 23, 2019

This update follows inquiries received regarding the status of the James Turrell Skyspace, a programmatic room for students designed to sit atop the School’s roof that is part of the originally-approved redevelopment plans. The Turrell Skyspace is not part of the curre...

August 15, 2019

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) between August 15 - September 30:

  • Construction work hours will remain the same: 7 AM – 6 PM on Monday – Friday, and 9 AM – 5 PM on Saturday

    ...

June 1, 2019

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) between June 2 and July 31, 2019:

  • Construction work hours will remain the same: 7 AM – 6 PM on Monday – Friday, and 9 AM – 5 PM on Saturday

    ...

May 30, 2019

With only three months until project completion in August, one of the final remaining infrastructure improvements is the installation of a 470 square foot greenhouse learning center atop the School’s roof. The installation process will take approximately six weeks to c...

April 19, 2019

A ConEd sub-contractor is currently working along the 16th Street sidewalk to connect gas service to the Friends townhouse buildings. Weather permitting, their daily work will run 9 AM to 2 PM on Friday (4/19), Monday (4/22), Tuesday (4/23) and Wednesday (4/24). For sa...

April 2, 2019

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) between April 2 and May 31, 2019:

  • Construction work hours will remain the same: 7 AM – 6 PM on Monday – Friday, and 9 AM – 5 PM on Saturday

    ...

January 28, 2019

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) between January 29 and March 31, 2019:

  • Construction work hours will remain the same: 7 AM – 6 PM on Monday – Friday, and 9 AM – 5 PM on Saturday...

November 20, 2018

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) for mid-November through December 31, 2018:

  • Construction work hours will remain the same outside of Thanksgiving Day, Christmas Day, and New Year's Da...

October 3, 2018

The following is a detailed schedule of construction activity on the Townhouse buildings (212-216 East 16th Street) for Oct 1 through Nov. 5.


 

EXTERIOR WORK ACTIVITIES ON THE TOWNHOUSES

·       Repointing of the Townhouse façade

·...

October 3, 2018

Dear Neighbors,

Please be advised that on Saturday, October 6, a small crane (called a “cherry picker”) will arrive onsite along 16th Street for a brief lifting operation to place two pieces of mechanical equipment on the roof of the Townhouse buildings. Our constructio...