The following is a detailed schedule of construction activities on the James Turrell Skyspace (218 East 16th Street roof) for the period beginning October 24 and ending November 11.
Plumbing
Install sprinkler branches
Install standpipe cabinets
Roof
Waterproofing
Electrical
Electrical roughing
Carpentry
Framing
Install insulation
Third-party inspections
Steel
Installations and rigging**
HVAC
Install louvers and ductwork
Chiller tie-in
Fireproofing
Spray on fireproofing
3rd-party inspections
**Please note that on Saturday, November 5, steel will be erected on to the rooftop for installation (weather permitting). This will require 1-day street closure of 16th Street to allow the mobile hydraulic crane to lift the steel. Flag persons will be present during the operation to ensure pedestrian safety. The School’s construction manager will place notices on 16th Street prior to commencement of this operation.